** Total Valuation is the total cost of labor and materials
» The Building Permit fee is based on Table 1-A of the 1997 UBC
» The plan review fee is 65% of the building permit fee. If the plan is a repeat or master plan, the plan review fee is $500.00
» The construction meter fee is $37.00
» Electrical fees
» Water tap fees
» Impact fees are as follows:
» Sales and Use Tax is 2.5% of one-half (1/2) the total valuation
» Proof of sewer tap purchase will be required before a permit will be issued